Merlin 3070 Service And Maintenance Manual page 143

Hide thumbs Also See for 3070:
Table of Contents

Advertisement

MOUNTING THE JACK PANEL BOXES
On your building floor plan, pencil in the control unit
location. The location must comply with the measurements
shown in the figure.
Within 5 feet of network
interface (where telephone
lines enter building). Your
network interface may look
different from this one.
5
Control unit location
Minimum of 2 feet off floor
Jack field
(Number of jack panel boxes
in field depends on number of
telephones. You will need one
box per six telephones.)
2 inches from control
unit or bottom of shelf
(if control unit will rest
on shelf)
Within 5 feet
of ac outlet

Advertisement

Table of Contents
loading

This manual is also suitable for:

1030

Table of Contents