Removing The Switch; Powering Off A Qfx5100 Device; Chapter 15 Removing The Switch - Juniper QFX5100 Hardware Manual

Hide thumbs Also See for QFX5100:
Table of Contents

Advertisement

CHAPTER 15

Removing the Switch

Powering Off a QFX5100 Device

Copyright © 2016, Juniper Networks, Inc.
Powering Off a QFX5100 Device on page 193
Removing a QFX5100 Device from a Rack or Cabinet on page 195
NOTE:
Use the following procedure to turn off power on a QFX5100 device
that is in standalone mode, a member in a QFX Virtual Chassis, or either a
spine device or a leaf device in a Virtual Chassis Fabric. QFX5100 devices that
are configured either as Node devices or as an Interconnect device in a QFabric
system running OS Junos release 14.1 or later, must use a different procedure
and CLI to ensure there is no traffic loss. See Adding or Replacing a Node
Device in a QFabric Node Group .
Before you power off a QFX5100 switch:
Ensure that you have taken the necessary precautions to prevent electrostatic discharge
(ESD) damage. See
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you do not need to forward traffic through the switch.
Ensure that you have the following parts and tools available to power off the switch:
An ESD grounding strap
An external management device such as a PC
An RJ-45 to DB-9 rollover cable to connect the external management device to the
console port
To power off a QFX5100 switch:
263.
193

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents