Table 25: Deployment Checklist (continued)
Item or Task
Measure the distance between external
power sources and switch installation
site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets
the minimum requirements for the
installation of the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor
and building structure.
Cables
Copyright © 2016, Juniper Networks, Inc.
For More Information
"AC Power Specifications for a QFX5100
Device" on page 79
AC Power Specifications for a QFX3600 or
QFX3600-I Device
AC Power Specifications for a QFX3500 Device
AC Power Supply Specifications for EX4300
Switches
"Rack Requirements for a QFX5100 Device"
on page 74
"Cabinet Requirements for a QFX5100 Device"
on page 75
Rack Requirements for a QFX3600 or
QFX3600-I Device
Cabinet Requirements for a QFX3600 or
QFX3600-I Device
Rack Requirements for a QFX3500 Device
Cabinet Requirements for a QFX3500 Device
Rack Requirements for EX4300 Switches
Cabinet Requirements for EX4300 Switches
"Clearance Requirements for Airflow and
Hardware Maintenance for a QFX5100 Device"
on page 76
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3600 or
QFX3600-I Device
Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3500 Device
Clearance Requirements for Airflow and
Hardware Maintenance for EX4300 Switches
Chapter 6: Preparation Overview
Performed By
Date
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents