Optional Power Box
10
10.2 Installation
1. Screw the lid off the unit.
2. Remove the cushion in the Power Box.
Figure 10-2
3. Refer to the pin assignment of Power Box mentioned earlier for connecting the
commutation and power wires.
4. Adjust the power supply switch to the appropriate voltage.
5. Power on the unit.
147
Need help?
Do you have a question about the GV-IP Speed and is the answer not in the manual?