Perkins New 1000 Series Workshop Manual page 299

4 and 6 cylinder diesel engines for industrial and agricultural applications
Hide thumbs Also See for New 1000 Series:
Table of Contents

Advertisement

12
New 1000 Series
To dismantle
Operation 12-17
1 Remove the coolant pump (A) from the engine, see Operation 12-13 or Operation 12-15.
2 Remove the circlip (A4) for the bearing housing (A3).
3 Support the pulley end of the pump and press the shaft (A6) through the impeller (A1) and coolant seal (A2).
This will also remove the bearing (A7). Discard the bearing and the shaft.
4 Remove and discard the impeller. Discard the coolant seal.
5 Support the pulley end of the pump and press out the bearing (A8). Discard the bearing.
6 Clean the body of the pump in a suitable safe cleaning fluid. Inspect the pump body for cracks.
4
2
3
1
5
6
8
7
9
A
A0306/1
Workshop Manual, TPD 1350E, Issue 4
285
This document has been printed from SPI². Not for Resale

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents