Operation 11-16 Electrical Shut Off Solenoid (Esos) - Perkins New 1000 Series Workshop Manual

4 and 6 cylinder diesel engines for industrial and agricultural applications
Hide thumbs Also See for New 1000 Series:
Table of Contents

Advertisement

New 1000 Series
Electrical shut off solenoid (ESOS)
General description
A new Junior Power Timer (JPT) ESOS was introduced to all new engines fitted with Lucas/Delphi fuel injection
pumps. A conversion kit is available to enable the new (JPT) ESOS male connector (A1) to be connected to
the Twin Lucar terminals (A4) on the wiring loom. The parts kit consists of a female adaptor (A2) with two male
Lucar terminals (A3).
To fit the conversion kit
1 Align and fit the female adaptor (A2) on the male connector (A1). Ensure that the two components are fully
engaged.
2 Insert the male Lucar terminals (A3) on the adaptor into the insulated female Lucar terminals (A4) on the
wiring loom. Ensure that both components are fully engaged.
Caution: This connection (B1) is compatible with IP67 waterproofing standards.
Wiring loom modification
To ensure that the connection from the new ESOS to the wiring loom is compatible with IP67 water proofing
standards, the twin Lucar terminals must be removed and a JPT adaptor kit fitted. The adaptor kit consists of
a female JPT adaptor (C1), two cable seals (C2) and two metal terminals (C3).
1
A
1
C
Workshop Manual, TPD 1350E, Issue 4
This document has been printed from SPI². Not for Resale
2
3
2
3
4
B
GE1005
GE1007
11
Operation 11-16
1
GE1006
243

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents