Caution: Do not tighten the union nuts of the high-pressure pipes more than the recommended torque
tension. If there is a leakage from the union nut, ensure that the pipe is correctly aligned with the atomiser inlet.
Do not tighten the atomiser union nut more, as this can cause a restriction at the end of the pipe. This can
affect the fuel delivery.
11 Fit all the pipes. Connect the control rod of the fuel injection pump. Fit the cables and connection for the
cold start device and electrical stop solenoid to the pump. Ensure that a spanner is used to prevent movement
of the pump outlets when the high-pressure pipes are fitted and tighten the union nuts to 22 Nm (16 lbf ft)
2,2 kgf m.
12 Eliminate air from the fuel system, see Operation 11-20.
13 Fit the cylinder head rocker cover.
14 Connect the battery.
15 Operate the engine and check for leakage. With the engine at the normal temperature of operation, check
that the idle speed and the maximum no-load speed are correct, see Operation 11-15.
Workshop Manual, TPD 1350E, Issue 4