BOMBARDIER 1980 Shop Manual page 254

Hide thumbs Also See for 1980:
Table of Contents

Advertisement

Connect drive chain using a connecting link.
The locking clip should be installed oppositely to driven
pulley.
Position gear change fork in gearbox cover so that it aligns
with slot of sliding gear in gear housing.
Gear change fork
1\ ~
JU\ ,.
J
0
'-
. /
Sliding
Apply a thin coat of "Loctite crankcase sealant". or
equivalent, on contact surface of gearbox casing.
SECTION 05
SUB-SECTION 04 (DRIVEN PULLEY)
Instal gearbox cover and secure with eight nuts. Torque
nuts to 27 Nom (20 ft-Ibs) in the following sequence:
o
6
7
0
14
8
2
5
o
Adjust chain tension. Check gearbox oil level.
Install gearbox rod and adjust. (See Section 05-07).
Install exhaust manifold to engine.
Install driven pulley support.
Install drive belt and check pulley alignment.
Install pulley guard.
(DRIVEN PULLEY). PAGE 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents