Lucent Technologies MERLIN LEGEND Release 6.1 System Planning Manual page 68

Release 6.1
Hide thumbs Also See for MERLIN LEGEND Release 6.1:
Table of Contents

Advertisement

MERLIN LEGENDCommunications System Release 6.1
System Planning 555-661-112
2
Control Unit Configuration
Recording System Operating Conditions
Automatic Maintenance Busy
The factory setting for Automatic Maintenance Busy is Disable, which means that
faulty lines/trunks are not automatically put in a maintenance-busy state.
In Key and Behind Switch modes, Automatic Maintenance Busy usually remains
disabled. If you plan to group lines/trunks into pools in Hybrid/PBX mode, enable
Automatic Maintenance Busy to provide optimal system performance.
For a detailed description of this feature (including considerations and feature
interactions), see the Feature Reference .
Planning Form Instructions
Under the Automatic Maintenance Busy heading in the System Operating
Conditions section of Form 1, page 2, do one of the following:
To keep the factory setting (no maintenance-busy state), check Disable.
To enable Automatic Maintenance Busy, check Enable.
Set System Date
The system date is the month, day, and year, shown on display telephones and
SMDR reports. For information on SMDR, see "System Features" in Chapter 4.
Error reports used by authorized technicians for maintenance also show the
system date and time.
These sections on the planning form remind you to set the system date when you
perform the initial programming for the system.
Planning Form Instructions
Check Yes under the Set System Date heading on Form 1 as a reminder to set
the current date.
2
2
Issue 1
August 1998
Page 2-10
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merlin legend

Table of Contents