Lucent Technologies MERLIN LEGEND Release 6.1 System Planning Manual page 173

Release 6.1
Hide thumbs Also See for MERLIN LEGEND Release 6.1:
Table of Contents

Advertisement

MERLIN LEGENDCommunications System Release 6.1
System Planning 555-661-112
4
Features
Telephone and Extension Features
Planning Form Instructions
1.
After assigning Individual Coverage for each receiver telephone, locate the
appropriate form for each sender telephone (Form 4b, 4d, 4f, 5a, or 5b)
2.
Under the Primary Cover Ring Delay heading, do one of the following:
3.
Under the Secondary Cover Ring Delay heading, do one of the following:
4.
After assigning senders to Group Coverage on form 7c, locate the
appropriate form for each sender telephone (Form 4b, 4d, 4f, 5a, or 5b).
5.
Under the Group Coverage Ring Delay heading, do one of the following:
To keep the factory-set delay, check the 2 rings box.
To change the factory-set delay, check the second box and write the
number of rings (1–6) in the space provided.
To keep the factory-set delay, check the 2 rings box.
To change the factory-set delay, check the second box and write the
number of rings (1–6) in the space provided.
To keep the factory-set delay, check the 3 rings box.
To change the factory-set delay, check the second box and write the
number of rings (1–9) in the space provided.
Issue 1
August 1998
Page 4-15
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merlin legend

Table of Contents