en | Installation
3.4

Checking the AC connection

1.
2.
3.
4.
5.
Warning!
After ensuring the AC connection is functional, turn the AC breaker off before continuing
!
the installation process.
3.5

Installing the power supply

Caution!
Debris
!
Damage to the power supply due to debris during the installation is possible.
Notice!
i
To prevent damage to the power supply during installation, ensure that the supplied
protective dust cover label is on top of the power supply before installing it.
2024-10 | V26 | F.01U.168.332
Ensure that the AC circuit breaker switch is off.
Connect the AC line to the AC terminal block.
Switch the AC breaker on.
Verify that the circuit breaker does not trip and that appropriate line voltage is present
on the fused side of the AC terminal block.
Switch the AC breaker off and continue with the rest of the installation.
Installation manual
Modular Alarm Platform 5000
Bosch Security Systems B.V.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Modular Alarm Platform 5000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel