Material Required; Check Before Start-Up; Overview Of Start-Up Steps - SICK GM32 Ex Operating Instructions Manual

In-situ gas analyzer measuring probe version
Table of Contents

Advertisement

7.2

Material required

7.3

Check before start-up

7.4

Overview of start-up steps

8015558/1O6S/V1-9/2024-08 | SICK
Subject to change without notice
System safety
ATTENTION
Responsibility for the safety of a system
The person setting the system up is responsible for the safety of the system in which
the device is integrated.
Not included in the scope of delivery!
Table 7: Material required for commissioning
Material required
19 mm open-end wrench
Optical cleaning cloth without
detergents
Personal protective equipment
Before every start-up
Check that all enclosures are closed
Enclosure cover
Cable inlets
Enclosure openings
Ensure the permanent feed of protective gas,
control FS850S", page
Step
Procedure
1
Removing the transport safety devices.
2
Install the device flange on the purge air
fixture.
3
Aligning the measuring probe.
5
Connecting the protective gas.
6
Connecting the potential equalization.
7
Electrical connection of SR-unit.
8
GMP measuring probe: Start the purge air
supply.
9
Install the SR-unit on the device flange.
10
Performing the optical fine alignment of
the SR-unit.
Part No.
Required for
Aligning the flanges.
4003353
Cleaning the window.
For protection when working on the duct or
with hot or aggressive sample gases.
see "Connecting the Ex overpressure
38.
Reference
see "Transport safety device", page
see "Installing the device flange on the
measuring probe", page
see "Aligning the measuring probe in flow
direction", page
see "Connecting the protective gas on the
SR-unit", page
see "Connecting the potential equalization
to the SR-unit", page
the potential equalization on the measur‐
ing probe", page
see "Electrical connection of SR-unit",
page
40.
see "Start-up of the purge air supply",
page
29.
see "Installing the SR-unit on the device
flange", page
see "Optical fine alignment of the SR-unit ",
page
49.
O P E R A T I N G I N S T R U C T I O N S | GM32 Ex
7
COMMISSIONING
22.
44.
45.
45.
41,
see "Connecting
38.
47.
43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GM32 Ex and is the answer not in the manual?

Table of Contents