Commissioning; Post-Mounting And Post-Connection Check; Switching On The Measuring Device; Setting The Operating Language - Endress+Hauser Proline Prosonic Flow I 400 Operating Instructions Manual

Ultrasonic time-of-flight flowmeter modbus rs485
Hide thumbs Also See for Proline Prosonic Flow I 400:
Table of Contents

Advertisement

Commissioning

74
10
Commissioning
10.1

Post-mounting and post-connection check

Before commissioning the device:
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-mounting" check→  32
• Checklist for "Post-connection check" →  41
10.2

Switching on the measuring device

Switch on the device upon successful completion of the post-mounting and post-
connection check.
 After a successful startup, the local display switches automatically from the startup
display to the operational display.
• If nothing appears on the local display or if a diagnostic message is displayed, refer
to the section on "Diagnostics and troubleshooting" →  126.
• If diagnostic information 104, 105 or 106 appears on the local display, then the
measuring point is not yet correctly mounted/configured →  135.
10.3

Setting the operating language

Factory setting: English or ordered local language
X X X X X X X
X
XX
1.
2.
3.
4.
 19
Taking the example of the local display
10.4

Configuring the measuring device

The Setup menu with its guided wizards contains all the parameters needed for standard
operation.
Proline Prosonic Flow I 400 Modbus RS485
X
20.50
XX
Main menu
0104-1
Display language
English
Operation
Setup
Display language
English
Ã
Deutsch
Español
Français
Display language
Ã
English
Deutsch
Español
Français
0104-1
0104-1
Hauptmenü
0104-1
Sprache
Deutsch
Betrieb
Setup
Endress+Hauser
A0029420

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Proline Prosonic Flow I 400 and is the answer not in the manual?

This manual is also suitable for:

9i4b

Table of Contents