Commissioning; Post-Mounting And Post-Connection Check; Switching On The Measuring Device; Connecting Via Fieldcare - Endress+Hauser IO-Link Dosimag Operating Instructions Manual

Electromagnetic flowmeter
Table of Contents

Advertisement

Dosimag IO-Link
Endress+Hauser
10

Commissioning

10.1

Post-mounting and post-connection check

Before commissioning the device:
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-mounting" check→  24
• Checklist for "Post-connection check" →  30
10.2

Switching on the measuring device

The function check has been completed successfully.
Switch on the supply voltage.
 The measuring device runs through internal test functions.
The device is operational and operation commences.
If the device does not start up successfully, depending on the cause, a diagnostic
message is displayed in the system asset management tool "FieldCare" .
10.3

Connecting via FieldCare

• For connecting FieldCare →  31
• For connecting via FieldCare →  32
• For user interface of FieldCare →  33
10.4

Configuring the measuring instrument

The device-specific parameters are configured via the "Commissioning wizard".
For detailed information on the "Commissioning wizard": Separate "Description of
Device Parameters "(GP) document →  66
Commissioning
35

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IO-Link Dosimag and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents