Commissioning
10.1
Post-mounting and post-connection check
Before commissioning the device:
‣
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-mounting" check→ 24
• Checklist for "Post-connection check" → 30
10.2
Switching on the measuring device
‣
The function check has been completed successfully.
Switch on the supply voltage.
The measuring device runs through internal test functions.
The device is operational and operation commences.
If the device does not start up successfully, depending on the cause, a diagnostic
message is displayed in the system asset management tool "FieldCare" .
10.3
Connecting via FieldCare
• For connecting FieldCare → 31
• For connecting via FieldCare → 32
• For user interface of FieldCare → 33
10.4
Configuring the measuring instrument
The device-specific parameters are configured via the "Commissioning wizard".
For detailed information on the "Commissioning wizard": Separate "Description of
Device Parameters "(GP) document → 66