3Com Baseline 2928 PWR Plus User Manual page 51

Baseline switch 2900 family
Hide thumbs Also See for Baseline 2928 PWR Plus:
Table of Contents

Advertisement

Figure 1-9 Configure stack ports on Switch B
In the Port
Settings area, select the check boxes before GigabitEthernet1/0/1,
GigabitEthernet1/0/2, and GigabitEthernet1/0/3.
Click Enable.
Now, switch B becomes a slave device.
# On Switch C, configure local port GigabitEthernet 1/0/1 connecting with Switch B as a stack port.
Select IRF from the navigation tree of Switch C to enter the page of the Setup tab, and then
perform the following configurations, as shown in .
1-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents