Omron V680-CA5D01-V2 User Manual page 58

V680 series rfid system id controller
Hide thumbs Also See for V680-CA5D01-V2:
Table of Contents

Advertisement

Antenna Port
Connecting and Removing the Connector
1.
Hold the base of the connector, and insert the connector while
matching the white mark on the ID Controller with the white mark on
the connector.
2.
Press the connector in vertically until it locks.
Be sure to hold onto the base of the connector. The connector will not lock if
the ring is held.
3.
To remove the connector, hold onto the ring and pull the connector
straight out.
The cable cannot be removed if the base of the connector is held. Never
pull excessively on the cable. Doing so will cause broken wires and dam-
age.
Do not remove or connect the connector when the power is turned ON.
Doing so may cause malfunctions.
Installation, Connections, and Wiring
Base of connector
SECTION 2
Ring
Ring
RFID System
55
User's Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V680-ca5d02-v2

Table of Contents