Preventative Maintenance - Mallinckrodt INOmax DSIR Plus MRI Operation Manual

Table of Contents

Advertisement

Preventative Maintenance

Mallinckrodt performs the following maintenance task every year:
• Replace O
and NO sensors.
2
Mallinckrodt performs the following maintenance task every two years:
• Replace battery.
• Check internal tubing.
• Replace sample system tubing and filters.
• Replace NO
sensor.
2
Figure 6-11
Part No. 20568 Rev-02
2015-08
Equipotential grounding is the bonding of
all conductive surfaces in the room together
and to earth. This can be implemented in the
patient care environment if it is crucial to keep
all conductive surfaces at the same electrical
potential or on the same ground plane.
If an equipotential grounding system is installed,
the ground system should be tested per chapter
four of NFPA 99.
6-11

Advertisement

Table of Contents
loading

Table of Contents