One-Point Barometric Pressure Verification; One-Point Volumetric Flow Rate Verification - Thermo Scientific 5030 Instruction Manual

Synchronized hybrid ambient real-time particulate monitor
Hide thumbs Also See for 5030:
Table of Contents

Advertisement

One-Point Barometric
Pressure Verification
One-Point Volumetric
Flow Rate Verification
Thermo Fisher Scientific
Note The temperature verification should be completed prior to performing
the RH-sensor verification due to a thermal compensation applied to the
RH-sensor.
If the Model 5030 RH sensor is slightly out of tolerance, ±3% RH, the
acceptance test should be classified as marginal. If the sensor performance is
less than marginal, please contact Thermo Fisher Scientific's Technical
Support at (866) 282-0430 or your local sales representative.
RH sensor calibration is covered in the "Calibration" chapter.
It is recommended that the NIST-traceable Hygrometer should also
compare well with the RH-measurement used within a gravimetric
laboratory that is part of a compliance program.
As per 40CFR, Part 50, Appendix L, Section 9.3, record the Model 5030
P3 barometric pressure sensor reading. This value is in units of hectopascal
(hPa). If necessary, using the conversion chart
NIST-traceable measurement to units of hPa for an appropriate
comparison. The Model 5030 P3 sensor should compare within ±13.33 hPa
tolerance of your NIST-traceable barometer. If the Model 5030 P3 sensor
performance is within this tolerance, the acceptance test has passed.
If the Model 5030 P3 sensor is slightly out of tolerance, ±15 hPa, the
acceptance test should be classified as marginal. If the sensor performance is
less than marginal, please contact Thermo Fisher Scientific's Technical
Support at (866) 282-0430 or your local sales representative.
The Model 5030 P3-Barometric Pressure sensor calibration is covered in the
"Calibration" chapter.
As per 40CFR, Part 50, Appendix L, Section 9.2.5, the flow rate of the
Model 5030 should be verified during this acceptance test. Prior to this test
it is important for the previous temperature and pressure acceptance tests to
be completed. Should the T1, T3, or P3 sensors require calibration, this
should be done prior to the flow rate verification.
(Table
From this screen, repeatedly press NEXT until you
arrive at the Main User Screen:
From here, press DISP then press NEXT and the
following screen appears:
Model 5030 SHARP Monitor Instruction Manual
Installation
Menu Tutorial
2-2) to convert your
2-13

Advertisement

Table of Contents
loading

Table of Contents