Thermo Fisher Scientific
8. Replace the front transparent cover plate on the central unit.
In case the inserted filter tape is not correctly tensioned (for example, in case
the reversing roller does not turn during the filter change cycle), the pump
will be switched on immediately after the filter tape change attempt is
complete, but at the same time a corresponding error status will occur.
Consequently, the filter tape needs to be checked. After investigation,
another filter change cycle has to be initialized by pressing the key "FC+Z"
again.
6. Press YES to advance the filter tape, and
the tape counter should be increasing.
Advance the filter tape until it has wrapped
around itself twice on the take-up reel (5).
Press NEXT.
7. At this screen, Press FC+Z. This will
perform a filter change and zero and
reinitialize aerosol measurement.
Model 5030 SHARP Monitor Instruction Manual
Installation
Filter Tape Installation
2-27