3. Drill a 2 ½-inch (64 mm) diameter hole at that location through the
roof.
4. Caulk around the 2 ½-inch hole and place the roof flange over the hole
(for the ambient shelter a gasket is provided in place of the caulking for
this step).
5. Secure the flange in place with four 3/8-inch lag bolts. Caulk around the
lag bolts to prevent leaks.
6. Thread the black tube-to-flange coupling into the flange until fully
tightened. Caulk around the outside edge of the coupling-flange
interface.
7. Remove the upper coupling with rubber ferrule and set aside.
8. Determine the exact length of sample tube needed above the roofline to
accommodate the inlet assembly.
Assuming an inlet height of 2-meters (78 ¾-inch) a PM
assembly would require exactly 1,391 mm (54 ¾-inch) of sample tubing
above the roofline and a PM
(59 ¾-inch) of sample tubing above the roofline.
Cut the stainless steel sample tube and debur the inner and outer edge of
the sample tube to avoid cutting the O-rings on the inlet adapter and
blocking any aerosol entering the sample tube.
9. Remove the two sets of brass resistance-heater connections from the
heated sample tube and set aside.
10. Place the inlet tubing through the roof flange and onto the top of the
Model 5030.
Note PLEASE PAY EXTRA CARE TO THE INTEGRATED
AMBIENT/HEATER TEMPERATURE SENSOR CABLE ASSEMBLY
THAT MUST PASS THROUGH WITH THE HEATED TUBE.
inlet assembly would require 1,521 mm