Monthly - Kodak Ektascan 2180 User Manual

Hide thumbs Also See for Ektascan 2180:
Table of Contents

Advertisement

User's Manual

Monthly

Procedure
In addition to the preventive maintenance procedure that should be followed every week,
the following procedure should be performed every month.
Follow the shutdown procedure and turn off all electrical power to the Processor before
performing preventive maintenance.
[1] Turn off the Processor by moving the Main Power Switch to the "0" position.
[2] Move the main wall circuit breaker for the Processor to the OFF position.
[3] Turn off the water supply.
Warning
Wear rubber gloves, safety glasses, and protective clothing when doing any
maintenance on the 180 LP or 180 LPS Processor.
[4] Lift the Top Cover of the Processor.
Caution
To prevent contamination of the developer and fixer solutions when removing the Fixer
Rack, place the Splash Guard between the Developer and Fixer Tanks. Use the Rack
Drip Tray for removal or installation of the Racks.
Caution
Handle all Racks carefully to prevent changing their alignment or causing damage. Do
not clean the Racks, Crossover Assembly or Squeegee Rollers with abrasive materials.
[5] Remove the Wet Section Cover, all Crossover Assemblies, and all Racks.
Note
Wipe all Rollers in the Dryer Rack using a clean, damp cloth. Check that the Dryer
Tubes are installed in the correct position. See the illustration that is located on the Cover
of the Dryer Rack.
[6] Check that the slots in the Dryer Air Tubes are clean and in the correct position. If
necessary, clean the Dryer Air Tubes with a bottle brush and then rinse them in
water.
[7] Clean all Crossover Assemblies, Racks, and the Crossover Rack Guide Shoes by
wiping with a soft, damp cloth and rinsing with clean, warm water.
15–8
5B9615