Outline Diagram; Mounting Method - Fuji Electric ZPG Instruction Manual

Ndir type infrared gas analyzer
Hide thumbs Also See for ZPG:
Table of Contents

Advertisement

9.3 Outline diagram

<Horizontal type>
<TOP VIEW>
<FRONT VIEW>
Power
Switch
<REAR VIEW>
Analog Output Connector (A/O)
Communication
Connector (RS485)
Analog Input
Connector (A/I)
Reference Gas Inlet Rc1/4 or NPT1/4
<SIDE VIEW>
2
24
(
Power Inlet Type(100V to 240V AC 50/60Hz))
(Unit : mm)
429
Flowmeter
415
463
483
Digital Input/output Connector (DIO1 to 2)
Purge Gas Inlet Rc1/4 or NPT1/4
Sample Gas Inlet Rc1/4 or NPT1/4
Power Inlet(100V to 240V AC 50/60Hz)
380
396
92

Mounting method

The analyzer weight should be sup-
ported at the bottom of the case.
19-inch rack mounting type
Sample Gas and reference gas Outlet Rc1/4 or NPT1/4
Fuse
(M4 Terminal Block Type
(M4 Terminal Block Type
16
<Rack dimensions>
450 or more
465
Mounting diagram
Guide rails
Guide rails
)
25
)
INZ-TN2ZPG-E

Advertisement

Table of Contents
loading

This manual is also suitable for:

ZpgaZpgdZpg3eZrg3

Table of Contents