Universal Robots Controller Installation
1. Remove the four screws on the top of the linear axis controller.
2. Place the UR controller on top of the linear axis controller and secure it with the four screws you previously removed.
Caution
Do NOT plug the UR controller power cable into UR controller .
Palletizing Solution - Instruction Manual
34
Need help?
Do you have a question about the PALLETIZING SOLUTION AX Series and is the answer not in the manual?
Questions and answers