Unload The Chip For Sequencing - Thermo Scientific Ion 520 User Manual

Table of Contents

Advertisement

Chapter 4 Start the Ion Chef
4

Unload the chip for sequencing

Unload the chip for sequencing

1. Open the instrument door.
a. In the instrument touchscreen, tap
b. Lift the instrument door to the top of the travel until the latch mechanism engages.
1
Hold here, then lift
1
2. Open the lid of the Chip-loading centrifuge, then unload the adapter/chip/bucket assembly from
the instrument.
Remove the adapter/chip/bucket assembly
1
3. Unload the chip from the adapter/chip/bucket assembly.
a. Apply pressure to both ends of the Chip Adapter, then remove and discard the Chip Adapter.
42
run
1
2
3
4
5
6
7
8
9
10
11 12
A
B
C
D
E
F
G
H
(Open Door), then wait for the latch to open.
Ion Chef™
S5 Series
Chip Balance
Ion 520
& Ion 530
ExT Kit − Chef User Guide

Advertisement

Table of Contents
loading

Table of Contents