Verify a NVMe Switch Card
Using the screw provided with the NVMe kit, secure the cable clamp to the board, then tuck the
NVMe cable into the cable clamp.
3.
Install the main module.
See
"Install the Main Module" on page
Verify a NVMe Switch Card
1.
Use the Oracle ILOM fault management shell to determine if the replacement
NVMe switch card is shown as enabled or disabled:
114
SPARC T8-4 Server Service Manual • January 2022
102.
Need help?
Do you have a question about the SPARC T8-4 and is the answer not in the manual?
Questions and answers