Gfi Pcie Cable Replacement - GE VIVID E9 Service Manual

Hide thumbs Also See for VIVID E9:
Table of Contents

Advertisement

GE H
EALTHCARE
D
GA091568, R
IRECTION
8-14-6

GFI PCIe Cable replacement

The GFI PCIe Cable connects the GFI Board in the Front End Card Rack (FEP) to the top of the Back
End Processor (BEP).
8-14-6-1
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the VIVID E9.
2.) Disconnect the Mains Power Cable from the wall outlet.
3.) Disconnect all probes.
4.) Remove both the Left Side Cover and the Right Side Cover.
8-14-6-2
Remove the GFI PCIe Cable
Follow these steps to remove the GFI PCIe Cable:
1.) Disconnect the GFI PCIe Cable from the top of the BEP.
2.) Disconnect the GFI PCIe Cable from the GFI board as described in these steps:
a.) On the Front End Card Rack, remove the cover for the GFI PCIe Cable connector.
b.) Unplug the GFI PCIe Cable.
3.) Loosen the GFI PCIe Cable from the cable clip.
4.) Remove the GFI PCIe Cable.
8-14-6-3
Install the GFI PCIe Cable
Follow these steps to install the GFI PCIe Cable:
1.) Route the new GFI PCIe Cable between the top of the BEP and the top of the FEP.
2.) Secure it with the cable clip illustrated in
Figure 8-258 GFI PCIe Cable secured with cable clip
3.) Connect the GFI PCIe Cable to the GFI board as described in these steps:
a.) Plug in the GFI PCIe Cable in the connector on the GFI board.
b.) Install the cover for the GFI PCIe Cable.
5
EVISION
1. GFI PCIe Cable secured with cable clip.
Chapter 8 - Replacement procedures
Figure
8-258.
1
VIVID E9 S
M
ERVICE
ANUAL
8 - 315

Advertisement

Table of Contents
loading

Table of Contents