Bep6 To Gfi And Card Rack Backplane Cable Replacement - GE VIVID E9 Service Manual

Hide thumbs Also See for VIVID E9:
Table of Contents

Advertisement

GE H
EALTHCARE
D
GA091568, R
IRECTION
8-11-15

BEP6 to GFI and Card Rack Backplane Cable replacement

8-11-15-1
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the VIVID E9.
2.) Disconnect the Mains Power Cable from the wall outlet.
3.) Disconnect all probes.
4.) Remove the Left Side Cover.
5.) Remove the BEP Cover.
a.) Loosen the BEP Cover's fixing screw(s).
b.) Tilt the top of the BEP Cover away from the BEP.
c.) Set the BEP Cover aside.
8 - 290
5
EVISION
-
On BEP6 there are two finger screws on the top of the BEP Cover.
Section 8-11 - Back End Processor (BEP) parts replacement
VIVID E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents