Back End Processor checks

If all the previous tests have been passed successfully, the Back End Processor is most likely OK.
4-3-11

Operator Panel Test

The Operator Panel is tested when the VIVID E9 is powered up as part of the start-up scripts, run
at every start-up.
4-3-12

Peripheral checks

4-3-12-1
Printer checks
The internal printer is controlled from the P1 and P2 keys on the VIVID E9's Operator Panel.
The factory default is:
P1 for the internal printer
P2 for external (network) printer
Table 4-7
Step
1.
2.
3.
4.
5
EVISION
Printer checks
Task
When scanning in 2D Color Mode, Press Freeze to
stop image acquisition.
Press P1 on the Operator Panel
Press P2 on the Operator Panel
Check if the print quality on the pictures from both
printers are of expected quality.
Chapter 4 - General procedures and Functional checks
VIVID E9 S
Expected Result(s)
Image scanning stops with the last picture on the
screen.
The image displayed on the screen is printed on the
assigned printer.
The image displayed on the screen is printed on the
assigned printer.
M
ERVICE
ANUAL
4 - 47

Advertisement

Table of Contents
loading

Table of Contents