GE VIVID E9 Service Manual page 90

Hide thumbs Also See for VIVID E9:
Table of Contents

Advertisement

GE H
EALTHCARE
D
GA091568, R
IRECTION
3-3-4-2
Damage in transportation
Follow this procedure if damage is apparent, or if the Tilt & Drop indicators show failure:
Table 3-4
STEP
1
2
3-3-4-3
If Shock Indicator has triggered or is missing
Table 3-5
STEP
1
2
3 - 6
5
EVISION
Damage in transportation
TASK
Write "Damage In Shipment" on ALL copies of the freight or express bill BEFORE delivery is accepted or "signed
for" by a GE representative or hospital receiving agent.
Report the damage to the carrier.
Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in
any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier.
A transportation company will not pay a claim for damage if an inspection is not requested within this 14
day period.
Shock Indicator has triggered or is missing
TASK
If the Shock Indicator is missing:
Note on the shipping papers at the time of receipt that the Shock Indicator label is
missing.
If the Shock Indicator has triggered:
Note on the shipping papers at the time of receipt that the Shock Indicator label was
activated.
Inspect the product for possible concealed damage.
Section 3-2 - Setup reminders
VIVID E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents