Adjusting The Pump Tubing - PerkinElmer AVIO 500 Customer Hardware And Service Manual

Icp optical emission
Table of Contents

Advertisement

Maintenance
292

Adjusting the Pump Tubing

Adjust the tension on the sample and drain tubing, one at a time, using deionized
water as follows:
Adjusting the Sample Tubing
1. Make sure the sample tubing is centered in the channel, then place the clamp
around the tubing and lower the clamp arm on onto the pump. Turn the
adjustment screws until locked in place.
2. Place the sample capillary (SAMPLE IN side) in a container of deionized
water.
3. Set the pump speed to 1.0 mL/min and start the pump.
4. Dip the tubing in DI water a few times to let air gaps form. As you watch the
air gaps form loosen the adjustment screw in a counterclockwise direction until
the air gaps stop or do not flow smoothly.
5. Tighten the adjustment screw slowly (turn clockwise) until you just see a
smooth flow of bubbles. Add an additional three more turns.
6. Turn off the pump. The tension is now correctly set. No bubbles should be seen
in the sample tubing once the sample tube is kept in the solution.
Adjusting the Drain Tubing
1. Make sure the drain tubing is centered in the channel without disturbing the
sample tubing, then place the clamp around the drain tubing and lower the
clamp arm.
2. Loosen the adjustment screw (turn counterclockwise) for the drain tubing
channel so that the lever can be easily opened and closed with little resistance.
3. Set the pump speed to 1.0 mL/min and start the pump.
4. Dip the tubing in DI water a few times to let bubbles form. As you watch the
bubbles form loosen the adjustment screw in a counterclockwise direction until
the bubbles stop or do not flow smoothly.

Advertisement

Table of Contents
loading

Table of Contents