To troubleshoot the
and/or
cation
DIP Switch Settings
NOTE: To use DIP Switch Settings, refer to the TBV
Operation and Maintenance Manual (JCM P/N 960-100926R).
To access the
TBV Performance Test
1. Set
TBV DIP Switch DS1
2. Apply power to the TBV Unit (the Bezel LED flashes
3. Connect the TBV Unit to the PC's USB port using a Male A
to mini-B USB Cable.
4. From
the JCM Tool Suite Application Service Mode
down menu (refer to Figure 2), click on
5. Click on the
the Test, click the
NOTE: When an Operation Test is selected, click the Close
box "X" icon (Figure 6 d) to halt the Test and close the screen.
© 2019 JCM Global Corporation
TBV™-100/101 Units
PERFORMANCE TESTING
TBV100/101 Unit
TBV Performance Test
STOP
Figure 6 TBV Performance Test Options
a
b
, either the
can be used.
:
or
DS3 Switch 8
to be performed. To halt
button (Figure 6
c
13
JCM Tool Suite Appli-
™
to
.
ON
White)
drop-
Performance Test
).
c
d
Part No. 960-000207R_Rev. A
.
.