2. Insert the eight cage nuts provided as follows. Four cage nuts install at the front of the
rack; four cage nuts install at the rear of the rack.
a. On the front of the rack, locate the appropriate screw holes, based on the rack
position determined in step 1.
b. Insert a cage nut in the topmost screw hole, one hole above the start of one rack
Unit.
c. Repeat steps 2a and 2b for each of three cage nuts.
d. On the rear of the rack, insert the four cage nuts that correspond with the cage nuts
you installed in the front of the rack.
3. Prior to positioning the SDCM Server and shelf in the rack, remove the rail extensions
as follows. See
Figure
a. Slide the shelf forward, exposing the four screws that secure the rail extensions.
b. Remove the two screws from each rail extension. Put aside in a safe place as you
will need these screws to reinstall the rail extensions (see step 5).
Installing and Configuring the SAN Director 64
2–11.
2–23