Cylinder Head Rubber Pad Installation; Exhaust System Construction - Suzuki TU250X Service Manual

Table of Contents

Advertisement

CYLINDER HEAD RUBBER PAD INSTALLATION

NOTE:
Insert the rubber pads at 0 – 4 mm (0 – 0.16 in) depth from the fin ends.
A 40 mm (1.6 in)
B 46 mm (1.8 in)

EXHAUST SYSTEM CONSTRUCTION

23 N . m
(2.3 kgf-m, 16.5 lbf-ft)
1 Exhaust pipe gasket
2 Exhaust pipe cover
3 HO2 sensor
C 118 – 122 mm (4.6 – 4.8 in)
D 32 – 34 mm (1.26 – 1.34 in)
50 N . m (5.0 kgf-m, 36.0 lbf-ft)
23 N . m (2.3 kgf-m, 16.5 lbf-ft)
*1
4 N . m (0.4 kgf-m, 3.0 lbf-ft)
4 Muffler connector
5 Muffler cover
*1 The tip of clamp must face inside of the exhaust pipe cover.
DIRECTION OF RUBBER
PAD INSERT
DIRECTION
OF RUBBER
PAD INSERT
E 70.5 – 72.5 mm (2.78 – 2.85 in)
25 N . m
(2.5 kgf-m,
18.0 lbf-ft)
20 – 30˚
SERVICING INFORMATION 10-19
23 N . m
(2.3 kgf-m, 16.5 lbf-ft)

Advertisement

Table of Contents
loading

Table of Contents