Reassembly And Installation - Suzuki TU250X Service Manual

Table of Contents

Advertisement

• Remove the wheel bearings 1 with the special tool.
The removed bearing must be replaced with a new one.
 09941-50111: Wheel bearing remover set
• Remove the spacer 2.
FRONT AXLE
Measure the front axle runout using the dial gauge.
If the runout exceeds the service limit, replace the front axle with
a new one.
 Axle shaft runout
Service Limit: 0.25 mm (0.010 in)
 09900-20607: Dial gauge
09900-20701: Dial gauge chuck
09900-21304: V blocks

REASSEMBLY AND INSTALLATION

Reassembly and install the front wheel in the reverse order of
removal and disassembly. Pay attention to the following points:
WHEEL BEARING
• Apply grease to the wheel bearings.
 99000-25010: SUZUKI SUPER GREASE "A"
or equivalent
CHASSIS 8-7

Advertisement

Table of Contents
loading

Table of Contents