Periodic Maintenance Schedule; Visual Inspection - Integra CUSA Clarity System Service And Maintenance Manual

Hide thumbs Also See for CUSA Clarity System:
Table of Contents

Advertisement

Ordering Replacement Parts
Order the following replacement parts from an Integra Service Center:
• IV Pole
• Power Cord
• Footswitch
• Contamination Guard
When ordering replacement parts for equipment, include the following information:
• Model number (located on the CUSA Clarity console rear panel)
• Serial number (located on the CUSA Clarity console rear panel)

7.6 Periodic Maintenance Schedule

The CUSA Clarity system is designed to meet the requirements specified in IEC 62353, Edition 2.0 2014-9. Record all periodic maintenance activities on
the data sheet supplied with this manual.
Frequency
Upon receipt of System
Upon receipt, following cleaning
Upon receipt, following cleaning
Every six months, when the color changes, or
when the surgeon notices a lack of suction.
Annually
Annually
Annually
Annually
Every 4 years
CUSA® Clarity System Service and Maintenance Manual
Task
Cleaning

Visual Inspection

Perform functional tests upon receipt
of the console from the distributor –
troubleshoot as required.
Replace the contamination guard.
Preventive Maintenance
Replace PC lithium battery.
Replace Suction motor pump controller
(S30904193).
Replace Contact, Grounding Finger
(72905223)
Replace 8GB mSATA card (72904462).
Table 7-2 Periodic Maintenance Schedule
Page 52 of 117
Procedure
Section 6.3 Cleaning and Sterilizing
Section 7.7 Visual Inspection
Chapter 7: Functional Testing
Section 8.2: Exporting Logfiles
Section 5.6 Connecting the Tubing Set
Contact service for assistance
Contact service for assistance
Contact service for assistance
Contact service for assistance
Contact service for assistance
0645403-2-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents