Revision History - Integra CUSA Clarity System Service And Maintenance Manual

Hide thumbs Also See for CUSA Clarity System:
Table of Contents

Advertisement

12.2 IT-System (Alternative method)
• The Safety Analyzer is connected directly to the mains (IT-System only).
• The DUT (Device Under Test) mains lead is connected to mains socket on the Rigel 288.
• Connect the handpiece and the footswitch.
• Attached the crocodile clip from the safety tester lead (Applied Part module port 1) to the proximal end of the tip (without the flue).
• From the Rigel 288 main menu, select Manual Mode –> IEC62353 –> AP Leakage Test –> Alternative as shown below:
• Execute the APPLIED PART LEAKAGE CURRENT measurement by pressing green button.
• A Warning message as described in paragraph 8.0 Earthing system appears on the Rigel 288 screen to inform the user that the test is
performed under IT-System network. Press the green button again to perform the test.
• Normalize measured value according paragraph 7.0 Normalization instructions and record the test result in IT0738A.

13.0 Revision History

Issue
ECO
Description
1
Initial release
2
Add to check & record if test is performed with original main lead
CUSA® Clarity System Service and Maintenance Manual
Updated by
Jean-Luc Billard
Jean-Luc Billard
Page 107 of 117
Date
26 Oct. 2016
19 Jan 2017
0645403-2-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents