Integra CUSA Clarity System Service And Maintenance Manual page 57

Hide thumbs Also See for CUSA Clarity System:
Table of Contents

Advertisement

WARNING
When measuring equipment leakage current of Class I ME equipment, an interruption of the grounding connection endangers system technicians and
bystanders.
NOTE
The Direct Method delivers erroneous values when supplied by an IT power system.
(b) IT-System (Alternative Method)
1. Connect the Safety Analyzer to the power source for an IT-System.
2. Connect the console to the main power socket of the Safety Analyzer.
3. Attached the crocodile clip from the Safety Analyzer lead (Applied Part module port 1) to the proximal end of the tip (without the flue) as
shown in the Figure 7-3.
4. Attached the test lead from the Safety Analyzer lead (Applied Part module port 2) to the Equipotential Earth Ground pin of the console as
shown in the Figure 7-3.
5. Install the handpiece.
6. Select Equipment Leakage Current measurement on the safety Analyzer.
7. The console stays off.
8. Obtain the Equipment Leakage Current measurement, and normalize the value according to Section 7.8.3 Normalization Instructions.
Test Description
Equipment Leakage Current
Table 7-6 Equipment Leakage Current Acceptance Criteria (Alternative Method)
9. Record values in the Electrical Safety Test Datasheet (IT0738A in Appendix A).
WARNING
When measuring equipment leakage current of Class I ME equipment, an interruption of the grounding connection endangers system technicians and
bystanders.
CUSA® Clarity System Service and Maintenance Manual
Figure 7-3
Unit
Acceptance Criteria
µA
≤ 1000 µA
Page 57 of 117
0645403-2-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents