ascom
Ascotel 2025/2045/2065
5.4.4
Installing and re-measuring the definitive System
For more detailed information, please refer to Part 4.
As soon as the definitive system is installed, test measurements should be carried
out in handover overlap border areas and compared with the results of the plan-
ning (see "On-site Measuring", Page 3.48). Critical areas should be discussed
with the customer (e.g. "Manager's Office").
3.58
Planning DECT Systems
HBT_20321104_03/B0_en