Installing And Re-Measuring The Definitive System - ASCOM Ascotel 2025 System Manual

Isdn telecommunications system
Table of Contents

Advertisement

ascom
Ascotel 2025/2045/2065
5.4.4

Installing and re-measuring the definitive System

For more detailed information, please refer to Part 4.
As soon as the definitive system is installed, test measurements should be carried
out in handover overlap border areas and compared with the results of the plan-
ning (see "On-site Measuring", Page 3.48). Critical areas should be discussed
with the customer (e.g. "Manager's Office").
3.58
Planning DECT Systems
HBT_20321104_03/B0_en