Preparing The Measurements - ASCOM Ascotel 2025 System Manual

Isdn telecommunications system
Table of Contents

Advertisement

Notes:
Take note of safety distances and safety regulations. In areas subject to
explosion hazards take note of the relevant rules and regulations.
This important phase of the project is to be explained in greater detail using an
example.
5.4.3.1

Preparing the Measurements

Drawing up a situation plan:
• The situation plan records approximately the
number and size of the coverage ranges
required.
• The measurements provide the ideal locations
for the radio units.
Radio supply and zone formation:
• Create a sensible distribution, e.g. several zones
in the factory and administration (porter's
lodge, basement, etc., in different zones).
• Make a note of the connection capacity
required (number of simultaneous calls) for each
zone to determine the number of radio units
(see also under "Traffic Density", Page 3.56).
HBT_20321104_03/B0_en
ascom
Ascotel 2025/2045/2065
Factory
2 floors
warehouse /
basement
haz0331aaena0
Zone 3
Zone 1
Zone 2
haz0347aadea0
Planning DECT Systems
Administration
5 floors
archive/basement
Porter's
lodge
Zone 5
Zone 3
Zone 4
3.51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ascotel 2045Ascotel 2065

Table of Contents