5.6.1
Functional Test Prior to use
Prior to any field use, we recommend a functional test in accordance with the
instructions below:
1. Recharge the batteries
– Fit the handsets and battery boxes with batteries.
– Put the equipment into operation
2. Test handsets: Handset 1 dials handset 2
® Connection is established via one of the two radio units.
3. Switch the handsets over to the other radio unit
(see "Test handset / Switching radio units")
4. Handset 1 dials handset 2 via the other radio unit
® Connection is established
5. Standard handsets: Using both handsets, call up the list of radio units present
using the "Test" – "Look" menus. Use the "¥" key to scroll through the list.
® The two radio units appear on the list.
6. Use the "¥" key to determine the field strength value of the two radio units.
® The measured value should be 60 hin the immediate vicinity of the test
radio unit.
5.6.2
Typical Measurement Process
The following work instructions have been compiled as a summary of the detailed
explanations above to enable efficient work on site. We are assuming that the
equipment has been correctly prepared and tested.
We shall be looking here at the case of a configuration with 2 radio units.
HBT_20321104_03/B0_en
ascom
Ascotel 2025/2045/2065
Planning DECT Systems
3.83