Avaya 1000M Upgrade page 152

Cs 1000m sg cp piv
Table of Contents

Advertisement

Page 152 of 212
NN43021-461
Standard 06.03
Performing the upgrade
4
Test system redundancy:
LD 137
TEST RDUN
DATA RDUN
5
Install the two system monitors. Test that the system monitors are
working:
LD 37
ENL TTY x
STAT XSM
****
6
Clear the display and minor alarms on both Cores:
LD 135
CDSP
CMAJ
CMIN ALL
June 2014
Load program
Test redundancy
Test database integrity
Load program
Enable the XMS, where x= system XMS
Check the system monitors
Exit program
Load program
Clear displays on the cores
Clear major alarms
Clear minor alarms