Avaya 1000M Upgrade page 153

Cs 1000m sg cp piv
Table of Contents

Advertisement

7
Test the clocks:
a.
Verify that the clock controller is assigned to the active Core:
LD 60
SSCK x
SWCK
****
8
Verify that the Clock Controllers are switching correctly:
SWCK
SWCK
9
Check applications.
10 Check dial tone.
Performing the upgrade
Load program
Obtain status of the clock controllers (x is "0" or
"1" for Clock 0 or Clock 1)
Switch the Clock (if necessary)
Exit program
Switch Clock
Note: You must wait a minimum of one minute for
clocks to synchronize.
Switch Clock again
End of Procedure
61C to CS 1000M SG CP PIV Upgrade
Page 153 of 212

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1 61c

Table of Contents