ABB DressPack Product Manual page 210

Table of Contents

Advertisement

4 Repair
4.2.5 Replacing the protection hose IRBDP SW6 UI and IRBDP MH6 UI LeanID
Continued
4
5
6
Cable and hose retainer wrist
1
Continues on next page
210
Action
Fit the middle jaws in one of the hose rein-
forcement funnel halves.
Note
The side of the hose reinforcement funnel
which has the bigger outer diameter shall
be turned towards the wrist.
Fit the other half of the funnel.
Fasten the hose reinforcement funnel with
the hose clamps.
Action
Arrange cable and hoses according to their
position in the cable and hose retainer.
Note
This is an example showing the Paracom
cable harness. If in doubt check the posi-
tions on a cable and hose retainer that still
is fitted.
© Copyright 2015-2017 ABB. All rights reserved.
Note
xx1400000350
xx1400000351
xx1400000209
Note
PROC 4
SP
CPS
WELD EARTH
WELD V
xx1200000106
Product manual - DressPack/SpotPack IRB 8700
3HAC055802-001 Revision: B
PROC 3
PROC 2
FB7
PROC 1
WELD U

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spotpack irb 8700

Table of Contents