Figure 59: Placing The Bumper Foot On A Base Corner Hole; Figure 60: Inserting The Rivet Into The Bumper Foot - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

3. Place the bumper foot onto one of the holes in the base of the switch.
Refer to Figure 59.
Figure 59. Placing the Bumper Foot on a Base Corner Hole
4. Insert the rivet to secure the bumper foot to the base. Refer to
Figure 60.
Figure 60. Inserting the Rivet into the Bumper Foot
5. Repeat steps 2 to 4 to install the remaining bumper feet.
6. Turn the switch over and place it on a flat, secure desk or table, leaving
ample space around it for ventilation.
7. Do one of the following:
To install power supplies, go to "Installing AT-PWR600 AC Power
x950 Series Installation Guide for VCStack
107

Advertisement

Table of Contents
loading

Table of Contents