Allied Telesis AlliedWare Plus x950 Series Installation Manual page 152

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Chapter 8: Configuring the Master Switch
Step
5
Enter the SHOW RUNNING-CONFIG command and verify the following:
- Check the running configuration for SWITCH PROVISION commands. There
should be one command for each switch and the commands should designated AT-
x950 switches. Here are examples for a stack of four switches:
switch 1 provision x950-28
switch 2 provision x950-28
switch 3 provision x950-28
switch 4 provision x950-28
- Check the running configuration for STACKPORT commands. There should be one
command for each switch and the commands should designate the trunk ports.
Here are examples:
.
interface port1.0.33-1.0.37
stackport
.
interface port2.0.33-2.0.37
stackport
.
interface port3.0.33-3.0.37
stackport
.
interface port4.0.33-4.0.37
stackport
Go to "What to Do Next" on page 153.
6
152
Table 27. Verifying the Master Switch (Continued)
Description and Command

Advertisement

Table of Contents
loading

Table of Contents