Figure 74: Installing The Switch On A Concrete Wall - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

6. Insert the four anchors into the holes.
7. Have two people hold the switch at the selected wall location while you
secure it to the wall with the four provided screws. Refer to Figure 74.
Figure 74. Installing the Switch on a Concrete Wall
8. Do one of the following:
To install the power supplies, go to "Installing AT-PWR600 AC
Power Supplies" on page 96.
To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 100.
After installing the switches of the stack, go to Chapter 8,
"Configuring the Master Switch" on page 133.
x950 Series Installation Guide for VCStack
131