5. Do one of the following:
To install power supplies, go to "Installing AT-PWR600 AC Power
Supplies" on page 96.
To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 100.
After installing both switches of the stack, go to Chapter 8,
"Configuring the Master Switch" on page 133.
x950 Series Installation Guide for VCStack
115