Allied Telesis AlliedWare Plus x950 Series Installation Manual page 124

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Chapter 7: Installing the Switch on a Wall
124
Cross-head screwdriver (not provided)
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided)
Drill and 1/4" carbide drill bit for a concrete wall (not provided)
Plywood base if you are installing the switch on a wall with wooden
studs (not provided.) Refer to "Plywood Base for a Wall with
Wooden Studs" on page 121 for illustrations.
Four screws and anchors for attaching the plywood base to the
wall (not provided)
Caution
The supplied screws and anchors may not be appropriate for all
walls. A qualified building contractor should determine the hardware
requirements for your wall before installing the switch.  E88

Advertisement

Table of Contents
loading

Table of Contents