Installing The Switch - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

Installing the Switch

Please review the information and perform the procedures in Chapter 3,
"Beginning the Installation" on page 77 before installing the switch.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E28
Note
The switch can be installed in an equipment rack with the optional
AT-RKMT-SL01 Sliding Rack Mount Kit. For instructions, refer to the
AT-RKMT-SL01 Sliding Rack Mount Kit Installation Guide.
Note
The switch comes with four brackets. Installing the device in an
equipment rack requires only two brackets. All four brackets are
used to install the switch on a wall.
To install the switch in a 19-inch equipment rack, perform the following
procedure:
1. Place the unit on a level, secure surface.
2. If you have not chosen an orientation for the switch in the equipment
rack, review "Switch Orientations in the Equipment Rack" on page 110.
3. Attach two of the four rack mount brackets to the sides of the switch in
the selected positions, with eight of the M4x6mm screws included with
the unit. The illustration in Figure 64 on page 114 shows the
installation of the brackets so that the front panel is even with the front
of the equipment rack.
x950 Series Installation Guide for VCStack
113

Advertisement

Table of Contents
loading

Table of Contents