Figure 72: Attaching The Switch To The Plywood Base - Allied Telesis AlliedWare Plus x950 Series Installation Manual

Advanced layer 3+, ethernet line card, ac power supply, fan module
Table of Contents

Advertisement

The sides of the switch have two sets of holes. One set is for installing
the switch on a wall with the brackets and the other is for the AT-
RKMT-SL01 Rack Mounting Kit. For this procedure, you need to use
the bracket holes, identified in Figure 61 on page 110.
3. After attaching the brackets to the side of the switch, have two people
hold the switch on the plywood base on the wall while you secure it
with the four provided screws. Refer to Figure 72.
Please follow these guidelines as you position the switch on the wall:
Position the switch so that the front panel is either on the left or the
right. Refer to Figure 66 on page 118. You may not install the
switch with the front panel facing up or down.
Leave sufficient space from other devices or walls so that you can
access the front and back panels. Refer to "Recommended
Minimum Wall Area Dimensions" on page 119.
Figure 72. Attaching the Switch to the Plywood Base
x950 Series Installation Guide for VCStack
127

Advertisement

Table of Contents
loading

Table of Contents